1MW Biomass Power Plant Cost & Design | Powermax Gasification
1MW Biomass Power Plant Cost & Design | Powermax Gasification
1MW Biomass Power Plant Cost & Design | Powermax Gasification
Mar 25, 2026
Share:

Turning Waste into Wealth: 1 MW Biomass Power Plant

As the world shifts toward sustainable energy, agricultural and forestry waste is no longer just a byproduct. Convert waste into reliable, clean electricity with our advanced biomass gasification systems.

THE CORE TECHNOLOGY: HOW POWERMAX GASIFICATION WORKS

PART A: Three-Step Proven Process

  • Step 1 - Gasification: Biomass is fed into the gasifier, going through drying, pyrolysis, oxidation, and reduction to produce raw syngas.
  • Step 2 - Purification: The producer gas undergoes a rigorous purification process to remove dust, coke, and tar, ensuring a clean fuel supply for the engine.
  • Step 3 - Power Generation: The purified gas fuels advanced generator sets (featuring Siemens technology alternators) to produce electricity.

PART B: Combined Heat and Power (CHP)

  • Maximum Efficiency: Our systems can be configured for CHP (Cogeneration) to meet both thermal and electrical base loads.
  • Waste Heat Recovery: The high-temperature exhaust gas can be captured by a boiler to generate steam or hot water.
  • Cost Reduction: Significantly increases the facility’s operational efficiency and decreases overall energy costs.

Proven Solutions for Every Need (50KW - 20MW)

Depending on your fuel type and specific requirements, a 1 MW facility can be powered by our established series of gasifiers:

UFBG Series (Updraft Fixed Bed)

Designed for high moisture adaptability and robust performance in biomass-to-energy conversion.

TFBG Series (Twin-fire Fixed Bed)

Advanced dual-fire technology ensuring clean gas output with ultra-low tar content.


Introducing the Smart Biowatt 1000

Traditional power plant construction can be time-consuming. That is why we engineered the Biowatt 1000: a 1 MW, skid-mounted, containerized biomass gasification system designed for rapid deployment and minimal site work.

Smart Biowatt 1000 Biomass Gasification System Installation

Key Advantages of the Smart Biowatt 1000

  • Space-Saving & Zero Civil Work: Factory-preassembled and containerized. No factory building needed. Requires a floor area of only 180 to 200 m².
  • Smart Installation: On-site installation takes only 7 to 10 working days, drastically reducing initial investment costs.
  • Smart Economy: Quick and simple installation minimizes commissioning time and allows for faster return on investment.

Technical Specifications (Biowatt 1000)

Parameter Specification
Rated Power 1000 kW (1 MW)
Biomass Consumption (Kg/hr) 1000 - 1500
Gas Production (Nm³/h) 2500 - 3000
Floor Area (m²) 180 - 200
Installation Time 7 - 10 working days

Ready to Build Your 1 MW Plant?

Tell us about your project requirements.
Our engineers will provide a Free Feasibility Assessment and ROI Calculation for your biomass project.

Product Catalog