Coalwatt® Modular Captive Power Plants
Deploy in 7-10 Days | Ideal for Mining & Industry
Transform local coal resources into reliable, cleaner electricity. Unlike traditional plants that take months to build, our containerized captive power plants are designed for rapid deployment. Get your industrial site off-grid and running in just 7-10 days.
What is the Coal Gasification Power Generation System (CGPS)?
The Process:
- Step 1: Coal is converted to low BTU coal gas in the gasifier.
- Step 2: Gas purification removes sulfur, nitrogen oxides, and dust.
- Step 3: Clean coal gas is fired in the specialized gas engine to generate electricity.
Why Choose Coalwatt® for Your Captive Power Needs?
Case Example: 4MW Captive Power for Mining Operation
Application: Remote mining operation needing reliable off-grid captive power.
Solution: Modular coal gasification system using local low-grade coal.
Configuration: 2 x Coalwatt-DF2000 Gasifiers + 8 x 500kW Gensets.
Results: 40% lower operating costs vs diesel generators | ROI in 3-4 years.
Deployment Time: 12 days from delivery to operation.
Technical Specifications
Single-Stage Gasifier System (For Anthracite, Coke)
| Model | Rated Power | Coal Consumption | Primary Fuel |
|---|---|---|---|
| Coalwatt-SS500 | 500 kW | 270-310 Kg/h | Anthracite Coal, Coke |
| Coalwatt-SS1000 | 1000 kW | 540-620 Kg/h | Anthracite Coal, Coke |
| Coalwatt-SS2000 | 2000 kW | 1080-1240 Kg/h | Anthracite Coal, Coke |
Double-Fire Gasifier System (For Low-grade coal, Biomass)
| Model | Rated Power | Coal Consumption | Primary Fuel |
|---|---|---|---|
| Coalwatt-DF500 | 500 kW | 270-310 Kg/h | Low-grade coal, Biomass |
| Coalwatt-DF1000 | 1000 kW | 540-680 Kg/h | Low-grade coal, Biomass |
| Coalwatt-DF2000 | 2000 kW | 1080-1360 Kg/h | Low-grade coal, Biomass |
Ready to lower your power costs?
Contact us for a quote on your Modular Captive Power Plant.

