Coalwatt® Modular Captive Power Plants | Deploy in 7-10 Days
Share This Product:
  • Information

Deploy Your Captive Power Plant in 7-10 Days, Not 18-24 Months

Transform local coal resources into reliable, cleaner electricity with our containerized captive power plants. Deployed in 7-10 days, not months.

Coal Gasification Power Generation System

POWERMAX's coal gasification power generation system (abbreviated as CGPS) is a kind of advanced power generating system integrating coal gasification technology and efficient gas engine/generator. CGPS includes coal gasification (coal gasifier) and gas purification (detarrer, desulfuration equipment) and coal gas power generating (coal gas engine).

Why Choose Our Solution for Your Captive Power Needs?

Fast Project Execution
Short project execution period. The captive power plant is normally started up within 5-6 months after contract signing.
Low Investment Cost
Low investment for captive power plant construction (including equipment, land, civil work and installation).
Operational Flexibility
Easy operation. CGPS may be started or stopped any time. The switch time is very short.
Minimal Resource Use
Low water consumption compared to traditional power plants.
Cost-Effective Operation
Low operation and maintenance cost - ideal for captive generation. Common technical workers are competent.
Environmental Compliance
Less contaminants. CGPS is more environmental friendly for captive power applications.

Case Example: 4MW Captive Power for Mining Operation

Application: Remote mining operation needing reliable off-grid captive power

Solution: Modular coal gasification system using local low-grade coal

Configuration: 2 x Coalwatt-DF2000 + 8 x 500kW gensets

Results: 40% lower operating costs vs diesel generators | ROI in 3-4 years

Deployment Time: 12 days from delivery to operation

Technical Specifications

The process of CGPS: Coal is converted to low BTU coal gas. Sulfur content, nitrogen oxides, dust are removed in the coal gas purification section. The clean coal gas is then fired to generate electricity in gas engine.
Single-Stage Gasifier System (For High-Grade Feedstock)
Model
Rated Power
Coal Consumption
Primary Fuel
Coalwatt-SS500
500 kW
270-310 Kg/h
Anthracite Coal, Coke
Coalwatt-SS1000
1000 kW
540-620 Kg/h
Anthracite Coal, Coke
Coalwatt-SS2000
2000 kW
1080-1240 Kg/h
Anthracite Coal, Coke

Double-Fire Gasifier System (For Maximum Fuel Flexibility)

Model
Rated Power
Coal Consumption
Primary Fuel
Coalwatt-DF500
500 kW
270-310 Kg/h
Low-grade coal, Biomass
Coalwatt-DF1000
1000 kW
540-680 Kg/h
Low-grade coal, Biomass
Coalwatt-DF2000
2000 kW
1080-1360 Kg/h
Low-grade coal, Biomass

Note: The power generating capacity is ranging from 100KW-20MW. One-stage, Two-stage circulating Fluidized Bed and Twin-fire coal gasifier (100KW-5MW) are used in CGPS.
Feedback form contact with us
Product Catalog