Customer requirements

Based on the provided information, the client's core need is for a stable, cost-effective, long-term reliance on external power supply makes the region particularly vulnerable

when dealing with unexpected situations.and environmentally compliant energy solution that utilizes local coal resources to achieve energy self-sufficiency within the remote Yakutia region.

Key Requirements:


  • Stringent Environmental Protection Requirements
  • Coal Resources and Electricity Demand

Preliminary plan

2MW Coalwatt DF2000 coal gasification power generation


To overcome the aforementioned challenges and achieve the project objectives, Powermax proposes the following technology and solution:
Based on tests conducted on the client's coal samples, we have selected our 2MW Coalwatt DF2000 coal gasification power generation equipment for the client.

Its core advantages include:

1)Rapid Installation: The modular frame structure facilitates transport and loading. On-site civil works are minimal or not required, and on-site installation can be completed in just one month.


2)Reduced Energy Costs: The system is compatible with lower-quality coal, effectively reducing operational costs based on local resource conditions. Using locally sourced materials maximizes

the reduction of coal transport expenses, improves overall coal utilization efficiency in coal-producing areas, and creates higher economic value.


3)High Gasification Efficiency: Gasification efficiency is ≥85%, and the system can achieve low-emission combined heat and power (CHP) based on demand.


4)Environmentally Friendly Technology: Converts coal into clean, combustible syngas as fuel, producing less waste. Waste products can be recycled, causing no environmental pollution.


5)Intelligent Management System: Features automatic control, remote monitoring, and automatic load regulation functions, significantly reducing manpower requirements.
Product Catalog