For a 5 MW biomass power generation project, Powermax offers three proven technology pathways. The optimal choice depends primarily on feedstock type and moisture content.

Core System Specifications at a Glance

Parameter WUFBG Fixed-Bed CFBG Fluidized-Bed Woodwatt Containerized
5 MW Configuration 5 × WUFBG in parallel 2 × CFBG3000 in parallel 5 × Woodwatt 1000 in parallel
Feedstock Type Chunky, wet biomass (chips/bark/EFB) Fine, dry particles (husk/sawdust) Wood chips / sawdust
Moisture Tolerance ≤55% (wet basis) ≤20% (wet basis) ≤55% (wet basis)
Particle Size 20–80 mm ≤15 mm 2–10 cm
Syngas Calorific Value 1,200–1,800 Kcal/Nm³ 1,200–1,300 Kcal/Nm³ ~1,200 Kcal/Nm³
Byproduct High-quality biochar Dry ash Biochar / Tar
Delivery Method On-site assembly On-site assembly Plug-and-play skid

Three Technology Pathways Explained

1. WUFBG Updraft Fixed-Bed Gasification System

Key Advantage: Handles feedstock with up to 55% moisture content directly—no costly drying equipment required. Produces marketable biochar as an additional revenue stream.
Best Suited For: Projects using wet wood chips, bark, palm EFB, or bagasse from agricultural and forestry waste processing.

2. CFBG Circulating Fluidized-Bed Gasification System

Key Advantage: Engineered specifically for fine, dry materials like rice husk and sawdust. Large single-unit capacity delivers stable syngas output ideal for grid-connected power generation.
Best Suited For: Rice mills, straw-fired power plants, and other sites with an abundant supply of dry, granular feedstock.

3. Woodwatt Containerized Gasification System

Key Advantage: Factory pre-assembled in shipping containers. On-site installation takes just 7–10 days with no need for a dedicated powerhouse. Overall CHP efficiency reaches 85–90%.
Best Suited For: Forestry sites, remote mining operations, or any location with limited construction infrastructure requiring rapid power deployment.

Three-Step Selection Process

Step Key Question Recommendation
1 Does your feedstock moisture consistently exceed 30%? Yes → WUFBG or Woodwatt
No → Proceed to Step 2
2 Is your feedstock primarily fine particles (husk/sawdust)? Yes → CFBG Fluidized-Bed
No → Proceed to Step 3
3 Do you need immediate power and have minimal civil works? Yes → Woodwatt Containerized
No → WUFBG

Our Services

• Complimentary feedstock analysis to determine the optimal technology match
• Full turnkey EPC solutions (engineering, manufacturing, installation, commissioning)
• Global project track record (Vietnam, Philippines, Indonesia, Canada, and beyond)